01 — Framing Division

Structure you can stand on.

Custom homes, production tracts, pop-tops and structural remodels. Every wall plumb, every header sized, every inspection called before you think to ask.

1,240 homes framed 30–50 psf snow load designs 10-year workmanship warranty

Our Approach

Framing is the one trade
every other trade
depends on.

If the frame is off by a quarter inch, the drywaller, the cabinet installer and the siding crew all pay for it. So we don't let it be off.

Our framing division runs three dedicated crews led by superintendents with 15 to 30 years each. We lay out from the plans with a total station on complex foundations, snap every line twice, and build walls on the deck so they're square before they're standing. Rough inspections are scheduled by us, walked with the inspector by our super, and photographed for your close-out packet.

Licensed Class C GC · Denver OSHA 30 Supervisors IRC 2021 / Denver Amendments
Completed stick-framed custom home shell in Castle Rock
5,400 sq ftRed Rocks Ridge · framed in 31 days

What We Frame

Every kind of structure,
from footings up.

Custom Home Framing

Full stick-frame or hybrid truss packages for architect-designed homes. Complex roofs, vaulted ceilings, steel moment frames and cantilevers are where our supers earn their keep.

  • Total-station layout on complex foundations
  • Engineered floor systems (I-joist, open-web)
  • Steel beam and moment frame coordination

Production Framing

For builders running tracts in Thornton, Parker and Castle Rock: repeatable plans, panelized or stick, framed on a cycle schedule that your other trades can plan around.

  • Capacity for 6–10 starts per month
  • Cycle-time reporting per lot
  • Dedicated builder account manager

Pop-Top & Addition Framing

Adding a second story to a Denver bungalow means tearing off a roof, tying into old lumber and getting dried in before the next storm. We do it in days, not weeks.

  • Structural tie-in to existing framing
  • Temporary shoring and weather protection
  • Match existing floor and ceiling heights

Structural Remodel Framing

Load-bearing wall removal, LVL and steel beam installs, new window and door openings, and the point loads carried all the way to the foundation where they belong.

  • Engineer-stamped beam sizing
  • Flush or dropped beam options
  • Basement bearing wall relocation

Garage & ADU Framing

Detached garages, carriage houses and accessory dwelling units under Denver's ADU ordinance. Floor trusses over the garage bay give you a clear-span apartment above.

  • Denver ADU zoning & setback compliance
  • Fire separation detailing
  • Alley-access site logistics

Deck & Outdoor Structure Framing

Ledger attachment done right, footings below frost depth, and beams sized for a Front Range snow load. Pergolas, covered patios and rooftop decks too.

  • DCA-6 compliant deck framing
  • 36" frost-depth footings
  • Steel-frame decks for long spans

Methods

Stick-built or trussed?
We do both, on purpose.

The right answer depends on your roof geometry, your attic plans, your schedule and your budget. Here's how we decide.

RIDGE BEAM · RAFTERS · CEILING JOISTS

Stick-Built Roof

Rafters and a ridge beam, cut and assembled on site. Best for vaulted ceilings, usable attic space, complex intersecting roofs, and pop-tops where a crane can't reach.

  • Vaulted and cathedral ceilings
  • Bonus rooms and finished attics
  • Unlimited design flexibility
  • More labor days, more lumber
ENGINEERED FINK TRUSS · 24" O.C.

Engineered Trusses

Factory-built to an engineer's design, set with a crane in a single day. Best for production homes, long clear spans, and anywhere schedule and cost predictability matter most.

  • Roof dried in 1–2 days
  • Clear spans up to 60'+ with no bearing walls
  • Engineered for exact snow loads
  • Attic space limited by webbing
Aerial of production homes at various framing stages in Thornton
Framed garage with ADU above in a Denver alley
Second story pop-top framed on a brick bungalow

Built for Colorado

Designed for the loads
this climate throws.

A Front Range home isn't a Phoenix home. Our standard details assume it will be buried in snow, hit by 100-mph downslope winds, and frozen and thawed 200 times a year.

  • 30 psf ground snow (Denver) to 50+ psf (foothills)
  • 115–140 mph ultimate wind speed, Exposure C
  • 36" frost depth footings, expansive soil details
  • Hold-downs and shear walls per engineer
  • WUI ignition-resistant framing in the foothills
  • IRC 2021 with Denver, Jeffco and Douglas amendments

Materials & Hardware

We don't cheap out on the parts you'll never see.

#2 & Better DF-L

Kiln-dried Douglas fir-larch dimensional lumber, culled on delivery. Crowns marked and set up.

LVL, PSL & Glulam

Engineered headers and beams sized by our partner engineer for every opening over 4 feet.

I-Joist Floor Systems

Straight, quiet floors with long spans. Glued and screwed subfloor, never just nailed.

ZIP System Sheathing

Integrated air and water barrier on every exterior wall, taped and rolled per Huber spec.

Simpson Strong-Tie

Hangers, straps, hold-downs and hurricane ties installed with the specified fasteners, not whatever's in the pouch.

Advanced Framing

24" o.c. where engineering allows, insulated headers, ladder blocking. More insulation, less lumber.

Steel Where It Counts

Moment frames, flitch beams and steel columns coordinated with our fabrication partner.

Photo Documentation

Every wall photographed before drywall so future trades know exactly where the studs and blocking are.

Sequence

A framing job,
start to dried-in.

Typical custom home: 4–6 weeks. Pop-top: 2–3 weeks. Production home: 8–12 working days.

Get a schedule for your project
01

Layout & Sill Plates

Foundation checked for square and level. Pressure-treated sills set on sill seal with anchor bolts torqued. Any foundation issues are flagged to you now, not after the walls are up.

02

Floor System

Rim joists, girders and I-joists set, then subfloor glued and screwed. Bearing points confirmed against the structural drawings before anything goes above them.

03

Wall Framing

Walls built flat on the deck, squared, sheathed and raised. Headers, hold-downs and blocking installed per plan. Interior walls follow, with backing for cabinets and fixtures.

04

Second Floor & Roof

Repeat for upper floors, then trusses are craned and braced or rafters cut and set. Roof sheathed with H-clips and dried in with synthetic underlayment the same day.

05

Punch & Rough Inspection

Our super walks every wall with a punch list, then walks it again with the inspector. Framing inspection passes, photos go in your file, and the trades roll in.

For Builders & General Contractors

Need a framing sub
you don't have to babysit?

We carry 12 production and custom builders on recurring schedules. Dedicated account manager, per-lot cycle reports, and crews that show up when the lumber does.

Framing FAQ

Questions we get
on every site walk.

Labor-only framing for a typical two-story home runs $12–$22 per square foot depending on complexity. Turnkey framing (labor plus lumber, hardware and sheathing) runs $38–$65 per square foot in the current market. Pop-tops and additions run higher per foot because of demolition, tie-in and shoring. Use our estimate calculator for a ballpark, then let us walk the site for a real number.
Either. Most homeowners and many builders prefer turnkey so there's one price and one party responsible for shortages and culls. We buy through two Front Range yards with builder pricing and pass through the savings. If you have your own supplier account, we'll frame labor-only and provide a detailed takeoff.
Yes. We frame year-round. Our crews are equipped for cold-weather work, and lumber actually stays straighter in the dry winter air. We build weather days into the schedule, and pop-tops get a temporary roof structure so the house below stays dry.
Our partner engineering firm stamps all of our structural drawings and beam calcs. If your architect already has an engineer, we work from their drawings and coordinate RFIs directly. Either way, you never have to chase an engineer yourself.
Our permit coordinator schedules the framing inspection and our superintendent walks it with the inspector. If a correction is called, we fix it the same or next day and re-schedule. Pass rates on first inspection are above 94% across the last 200 jobs.
10 years on workmanship, which is longer than Colorado's 6-year statute of repose for construction defects. If a wall we framed is out of plumb or a header sags because of how we built it, we fix it at no cost.