Permit Services

We live in the permit portal so you don't have to.

Our permit desk prepares the application, submits the drawings, answers the plan reviewer's comments, schedules every inspection and closes the permit out. Seven metro jurisdictions, 94% first-time inspection pass rate.

Quick Check

Do I need a permit?

Pick your project and jurisdiction for a general answer. We confirm every project against the current code before we start.

Almost always needs a permit

  • Additions, pop-tops, dormers
  • Removing or altering a bearing wall
  • New or replaced deck attached to the house
  • Basement finish (framing, electrical, plumbing)
  • Detached garage over 200 sq ft
  • Any ADU
  • New window or door openings
  • Re-roof (most jurisdictions)
  • Electrical, plumbing or HVAC work

Usually exempt, but verify

  • Like-for-like siding in Denver (not in most suburbs)
  • Painting, caulking, trim repair
  • Freestanding deck under 30" high and under 200 sq ft, not attached
  • Sheds and pergolas under 200 sq ft (setbacks still apply)
  • Same-size window replacement without changing the opening
  • Fences under 6 feet (zoning permit may apply)
  • Cabinets, flooring, countertops

Jurisdictions We Work In

Every building department
is a little different.

Typical plan-review timelines from our last 24 months of permits. These move with the season and staffing; we'll give you a current estimate for your address.

JurisdictionDeckAddition / Pop-TopADUSidingNotes
Denver (City & County)1–2 wks6–10 wks8–14 wksUsually exemptBulk plane and zoning review; e-permits portal; historic districts add review
Aurora1 wk4–6 wks6–10 wksRequiredFast deck counter; HOA letter often requested
Lakewood1 wk4–8 wks6–10 wksRequiredThorough structural review; snow load 30 psf
Arvada3–5 days4–6 wks6–8 wksRequiredOver-the-counter decks with DCA-6 plan
Westminster / Thornton1 wk4–6 wks6–8 wksRequiredAdams County portions have separate zoning
Littleton / Centennial1 wk4–6 wksVariesRequiredCentennial uses a third-party reviewer; consistent turnaround
Parker / Castle Rock1 wk4–8 wks6–10 wksRequiredCastle Rock: 40 psf snow, WUI in some areas
Golden / Jefferson County1–2 wks6–8 wks8–12 wksRequiredFoothills: 40–55 psf snow, WUI ignition-resistant construction
Douglas / Arapahoe / Adams Co.1–2 wks4–8 wks6–12 wksRequiredUnincorporated areas; septic and well may add review

Timelines are from our own permit history and are not guarantees. Permit fees are passed through at cost; our coordination fee is a line item on every estimate.

Tyler Brooks, permit and compliance coordinator
Tyler BrooksPermit & Compliance Coordinator

What the Permit Desk Does

Application to
closed permit.

Zoning & code check

Before drawings start, we confirm setbacks, height, lot coverage, bulk plane, ADU eligibility, HOA rules and any historic or WUI overlays for your exact parcel.

Drawings & application

Our drafting studio and partner engineer produce the permit set. Tyler assembles the application, energy forms, site plan and structural calcs and submits through the jurisdiction's portal.

Plan review comments

When the reviewer has questions (they usually do), we answer them, revise the sheets and resubmit, typically within 3 business days of receiving comments.

Inspections

Footing, framing, sheathing, insulation, final and every trade rough-in are scheduled by us and walked by our superintendent. 94% pass first time.

Close-out

Final approved, permit card and inspection record go in your close-out packet along with warranties and as-built photos. Your future buyer's inspector will thank you.

Permit-Only Services

Not building with us? We can still pull your permit.

For Homeowners (Owner-Builders)

Doing the work yourself? We'll produce the drawings and handle the application and revisions so your project starts on the right side of the building department.

from $850
plus jurisdiction fees

For Other Contractors

Trade and specialty contractors who'd rather build than sit at the counter. We handle submittal, comments and inspection scheduling under your license or ours.

from $650
per permit, volume pricing available

Unpermitted Work Legalization

Bought a house with an unpermitted addition or basement? We assess, document, draw and shepherd it through the retroactive permit process so it's legal when you sell.

Assessment $350
credited toward the project

Request Permit Services

Tell us about
the permit you need.

Tyler reviews every request and responds within one business day with the jurisdiction's requirements, a timeline and a fixed coordination fee.

  • Zoning and code pre-check included
  • Fixed fee, quoted upfront
  • Jurisdiction fees passed through at cost
  • Drawings and engineering available
I am a… *
Please choose one.
Required.
Required.
We need the address to look up the parcel.
Do you have drawings?
Required.
Enter a valid email.
Enter a 10-digit phone number.

Got it.

Tyler will look up your parcel and get back to you within one business day.

Permit FAQ

The questions
everyone asks.

Best case, nothing until you sell, when the buyer's inspector flags it and you either legalize it retroactively (at roughly double the original permit cost, sometimes with demolition of finishes to expose framing) or take a price hit. Worst case, a stop-work order, fines, and your homeowner's insurance denying a claim related to the work. We won't build without one.
Jurisdiction fees are usually based on project valuation. A deck permit runs $150–$500; an addition $1,500–$5,000; an ADU $3,000–$8,000 including plan review and sometimes impact or use-tax fees. Denver also collects use tax on materials at permit issuance. Our coordination fee is separate and quoted as a fixed line item.
Often, yes, and HOA approval is separate from the building permit. Many suburban jurisdictions won't issue a permit without an HOA approval letter for exterior changes. We'll prepare the HOA submittal package (drawings, colors, materials) alongside the permit application.
In most metro jurisdictions a homeowner can pull a permit for work on their own primary residence. But you become the responsible party for inspections and code compliance, and some trades (electrical, plumbing) still require a licensed contractor's permit. For anything we build, we pull the permit under our license so the liability sits with us.
Zoning asks "can this go here?" (setbacks, height, lot coverage, use). Building review asks "is it built safely?" (structure, egress, energy, fire). Most permits go through both, in that order. Denver's bulk plane rules and ADU zoning are where most residential projects hit snags, which is why we run the zoning check before drawing anything.