- Added area
- 640 sf
- Frame duration
- 11 days
- Stories
- 2
The constraint
The existing rafters were undersized for a clean tie-in, and the alley grade left almost no room for a crawl access.
Outcome
The addition reads as part of the bungalow from the alley, and the kitchen opened the week the siding was punched.
Scope
- 01640 square feet of new floor across two levels
- 02New ridge and valley framing married to the original roof
- 03Fiber-cement lap that steps into the original reveal
- 04Temporary shoring so the kitchen stayed usable for ten days