Skip to content
HelixFrame & Siding

Services · Structure

Framing

Helix started as a framing crew and still treats the skeleton as the job that everything else has to trust. We frame additions, new homes, garage apartments, and the openings that let a kitchen breathe.

Framing

Design studio

One framing project. Change any part of it.

Drag to turn the model. Each control changes only the part it names, and the spec underneath updates with it.

Building the model
Drag to turn

Configure

Solid sawn floor, LVL beam

Fresh fir · Open studs

Floor systemSolid sawn
BeamLVL
WallsOpen studs
LumberFresh fir
Profile
2x10 solid sawn joists. A three-ply LVL beam on posts. Stud bays stay open for the mechanical walk. Fresh fir lumber.
Spacing
Studs and joists at 16 inches on center
Substrate
The sill is checked against the foundation before the first stud
Helix does
We lay out the floor, set the beam, stand the studs, and sheathe the walls when the plan calls for it.
Partner does
The engineer of record, and concrete when the stem wall is new.

Before and after

Drag across the job.

After: Framing
BeforeAfter
A bare stem wall, then the same addition framed through the roof.

What is in the scope

  • 01Floor systems, shear walls, and roof framing
  • 02Engineered beams, flush beams, and point loads
  • 03Stair openings, window packages, and temporary weather protection
  • 04Layout that matches the drawings, not a guess at the chalk line

Typical sequence

  1. 1Verify the foundation or existing plate before the first stud stands
  2. 2Stand walls, set beams, and roll the roof
  3. 3Sheathe and brace so the inspector sees a complete load path
  4. 4Hand the dried-in shell to the envelope crew

Partners Helix schedules